Thank you for your patience while we retrieve your images.
Visitors 2305
Modified 8-Feb-23
Created 14-Apr-11
227 photos

Following the success of the prototype BR built 800 OBA, planned as a replacement for Tubes, they have high ends, turnover bolsters on the floor and extending side stanchions. The first 500 Ashford built have doors of different lengths. The second lot had doors of the same length and were introduced with Bruninghaus suspension, a retrospective modification fitted to many of the first lot. Cambrian make a 4mm kit of the Shildon build, and Bachmann a RTR of the Ashford build
NOTE – These photographs are low quality scans and may not print well. Do not order larger prints.
110004_OBA__m_M110005_ZCA__1m_M110005_ZCA__2m_DC110006_ZDA_BASS__m_110009_OBA__m_DC110012_ZDA_BASS__1m_DC110012_ZDA_BASS__2m_DC110012_ZDA_BASS__m_110013_OBA__1m_110013_OBA__m_110014_OBA__m_DC110016_ZDA_BASS__m_DC110021_ZDA_BASS__1m_DC110021_ZDA_BASS__2m_110023_OBA__m_DC110038_ZDA_BASS__m_110053_OBA__m_110054_OBA__2m_110054_OBA__1m_110060_OBA__m_

Categories & Keywords
Category:Transportation
Subcategory:Railway
Subcategory Detail:
Keywords:BR open merchandise, OBA, Railway wagon, steel carrying wagon