The SMBP fleet was split between Shell and British Petroleum, making for complex histories. These British Petroleum wagons were built by Pickering in 1966-7 originally air braked and during the early 1980s re-equipped with Bruninghaus suspension in the early 1980s.
Category:Transportation
Subcategory:Railway
Subcategory Detail:
Keywords:
© Paul Bartlett's Photographs