Thank you for your patience while we retrieve your images.
Visitors 1136
Modified 25-Jul-20
Created 2-Apr-11
24 photos

Fifty pipe wagons were converted to Air brake in 1983, as one of the last jobs completed at Shildon works. Initially for the MoD they went off of TOPS when loaded. Later the engineers used them. Detail photographs included.
113000 ODA @ Gloucester 88-08-20 © Paul Bartlett w113000 ODA113006 ODA113011 ODA 12T converted Pipe Tare 8-800kg Design code OD001A Lot 4030 Shildon 1983 @ Severn Tunnnel Junct 85-04-13 © Paul Bartlett w113011 ODA @ Severn Tunnel Junction 85-04-13 © Paul Bartlett w113011 ODA113016 ODA 12T converted Pipe Tare 8-800kg Design code OD001A Lot 4030 Shildon 1983 @ Severn Tunnnel Junct 85-04-13 © Paul Bartlett w113016 ODA @ Severn Tunnel Junction 85-04-13 © Paul Bartlett w113017 ODA @ Gloucester 89-11-26 © Paul Bartlett w113017 ODA113018 ODA 12T converted Pipe Tare 8-900kg Design code OD001A Lot 4030 Shildon 1983 @ Severn Tunnnel Junct 85-04-13 © Paul Bartlett w113018 ODA113031 ODA @ Severn Tunnel Junction 85-05-29 © Paul Bartlett w113038 ODA bw113038 ODA centre113038 ODA end113038 ODA left113038 ODA right113038 ODAKDC113041 ZDA

Categories & Keywords
Category:Transportation
Subcategory:Railway
Subcategory Detail:
Keywords:BR, BR Pipe wagons, ODA, Pipe wagons, Railway wagon, S&T, Satlink